• Buradasın

    Bambu Lab A1 Bed Tramming Guide

    wiki.bambulab.com/en/a1/maintenance/manual-bed-tramming

    Yapay zekadan makale özeti

    Preparation
    • Heatbed is calibrated before leaving factory
    • Remove hotend sock and clean nozzle
    • Loosen heatbed locking screws and clean build plate
    • Tighten leveling screws until flush with bottom bracket
    Tramming Process
    • Download and transfer g-code file to MicroSD Card
    • Wait 30 seconds at front left corner
    • Adjust leveling screws until nozzle barely touches surface
    • Repeat process on right and left rear corners
    • Process takes about 8 minutes total
    Troubleshooting
    • If surface doesn't touch nozzle, tighten right locking screws
    • Loosen left screws counterclockwise 3 turns, right 1 turn
    • Submit technical ticket with problem pictures if needed

    Yanıtı değerlendir

  • Yazeka sinir ağı makaleleri veya videoları özetliyor